日韩黄色二区免费电影|黄色AV一二三区|日韩一区二区三区四区|亚洲综合第一页丝袜|国产wwwxxx|亚州AV熟女国产一区二区三区|久久av一区二区三区四区|欧州性开放无码A片|久青草视频国内无码|蜜桃A区二区av销魂美女

2024-05-27

Tilenga EPSCC project in Uganda

Suhigo's equipment: rotated pipelayer, trencher, conveyor pulley, etc

 

Suhigo provides pipeline construction equipment such as rotated pipelayer, trencher and conveyor pulley for the Tilenga EPSCC project in Uganda, which is the main oil-producing block in the development of Lake Albert oil and gas field in Uganda. The southern inter-well pipeline started construction this time is 98.4 km long. It includes cluster well sites and inter-well pipelines, water intake pipelines, lake water intake facilities, and Nile directional drilling. After the completion of the project, it will help Uganda become an important crude oil producer in East Africa and is of great significance to promoting Uganda's oil exports and international energy cooperation.